
Grounding / Bonding
Field trigger: Natural gas piping bonding, CSST coordination, mechanical/plumbing inspection questions, and where NEC stops and product/AHJ rules begin.
2020 NEC lookup refs: 250.104(B)250.104(C)110.3(B)
Hard-copy lookup path:
Last updated: Never