
Services / Grounding
Field trigger: Main bonding jumper, service disconnect, neutral-to-ground relationship, supply-side bonding, and service equipment checks.
2020 NEC lookup refs: 250.24(A)250.24(B)250.24(C)250.24(D)250.28230.70230.71
Hard-copy lookup path:
Last updated: Never